AI‑Driven Development at a Mid‑Size Retailer: A Data‑Backed Case Study
Introduction 55 % reduction in feature-to-production lead time was recorded during a six-month pilot at a mid-size retailer, shrinking the cycle from 12 weeks to 5.4 weeks. The pilot also cut defect leakage by 40 % and lifted developer output by roughly 30 %. Yes, AI-driven development tools can deliver measurable speed